<cite id="ddhtb"><video id="ddhtb"><thead id="ddhtb"></thead></video></cite><var id="ddhtb"></var><var id="ddhtb"><video id="ddhtb"><listing id="ddhtb"></listing></video></var>
<var id="ddhtb"><strike id="ddhtb"></strike></var>
<cite id="ddhtb"><video id="ddhtb"><menuitem id="ddhtb"></menuitem></video></cite><cite id="ddhtb"><video id="ddhtb"></video></cite>
<var id="ddhtb"></var>
<cite id="ddhtb"></cite>
<menuitem id="ddhtb"></menuitem>
<var id="ddhtb"></var>
<menuitem id="ddhtb"></menuitem><ins id="ddhtb"><span id="ddhtb"></span></ins>
<var id="ddhtb"><strike id="ddhtb"><listing id="ddhtb"></listing></strike></var> <menuitem id="ddhtb"><video id="ddhtb"><thead id="ddhtb"></thead></video></menuitem><menuitem id="ddhtb"><span id="ddhtb"><thead id="ddhtb"></thead></span></menuitem>
<ins id="ddhtb"><noframes id="ddhtb">
<menuitem id="ddhtb"></menuitem><var id="ddhtb"></var>
<var id="ddhtb"></var>
<var id="ddhtb"></var>
<menuitem id="ddhtb"></menuitem>
<var id="ddhtb"><span id="ddhtb"><var id="ddhtb"></var></span></var>
<var id="ddhtb"></var><var id="ddhtb"><video id="ddhtb"></video></var>
<menuitem id="ddhtb"></menuitem>
 
2015年公路造價師考試《案例分析》沖刺試題(2)

首頁 > 

考試

 > 2015年公路造價師...

2015年公路造價師考試《案例分析》沖刺試題(2)

點擊查看:2015年公路造價師考試《案例分析》沖刺試題匯總

沖刺題2:

跨線橋工程基坑開挖后發現有城市供水管道橫跨基坑,須將供水管道改線并對地基進行處理,為此業主以書面形式通知施工單位停工十天,并同意后天期順延十天,為確保繼續施工要求工人、施工機械等不要撤離施工現場,但在通知中未涉及由此造成施工單位停工損失如何處理。施工單位認為對其損失過大、意欲索賠。

問題:

索賠能否成立,索賠證據是什么?

由此引起的損失費用項目有哪些?

如果提出索賠要求,應向業主提供哪些索賠文件?

分析要點:

本案例主要考核工程索賠成立的條件,索賠的內容與證據,索賠文件的種類、內容及形式。

答案:

1.索賠成立,索賠證據為業主提出的要求停工的通知書。

2.費用損失主要包括:10天的工人窩工、施工機械停置及管理費用。

3.應向業主提供的索賠文件主要有:

①致業主的索賠信函、提出索賠要求。

②索賠報告:提出索賠事實和內容,引用文件說明索賠的合理與合法性,提出索賠費用的計算依據以要求的索賠金額。

③索賠費用計算書及索賠證據復印件。

更多精彩資訊請關注查字典資訊網,我們將持續為您更新最新資訊!